The Lundy Projects’ teams fully committed to deliver safely and on schedule several bridges, walkways and structures during the Christmas break at Acton, Ealing Broadway, West Ealing and Bristol Stations. In addition, all UTX (Under Track Crossings) installations at Warrington and Peterborough have been successfully installed on time and safely.